WWW.SPOOREEN.BE
Modeltrains in 1/32


General information
GAUGE 1 IN BELGIUM MODULEPROJECT TIPS - TRICKS
AGENDA INFO
> Home > GAUGE 1 IN BELGIUM > La chiesa lungo la ferrovia Svizzera






LA CHIESA LUNGO LA FERROVIA SVIZZERA  -

THE CHURCH ALONG THE SWISS RAILROAD  -

DIE KIRCHE ENTLANG DER SCHWEIZER  EISENBAHN


Peter is building landscape modules , inspired on a Swiss landscape. A single track  will come out of a tunnel on the left hand side, run over  a bridge, pass a ruine and will leave again through a tunnel on the right hand side. Overhead catenary is the SBB-CFF -FFS style  but we also have DB catenary.
We will cover periods II through VI with rolling stock.



under construction : the FS ALe 840

840


Update  18/12/2019 :

We assembeled the layout again, after the exposition in Friedrichshafen.
To transport the layout, we build boxes in which all parts are put in, so everything is protected.

transport box

The transport of the catenary system  :

catenary


The catenary is tensed up on bothe sides of the layout in the small black technical boxes.
One box also contains the command system for the trains and track related products (switsches and signals)  : ECoS with booster, router and the FUNKY system.
 A cooling fan is build in to prevent excessive heating of the command system.
The other box contains the domotica system (Crestron) and the connection panel (connection with the stroboscopes, lights in the buildings, sound system, layout  lighting)

 

opspannen



Technical black box, the ECoS is not yet installed.
This box corresponds with the box nr 2 here below






crestronecos

            Box 6 :  Crestron system 
            Box 2 :  ECoS  - FUNKY
            The box with the painted number 6 on it, is the transportbox of the Crestron layoutbox on his right hand side, idem for box nr 2.



26042019

film

ART-and-TRAINS catenary poles and signal.

17/04

sbb


Märklin SBB catenary poles, slightly modified.

sbb


sbb

1220182



30/12/2018  :  we are making landscape boxes to put in front of the existing layout so the trains are running through the landscape. Everything is modular.

1220183

1220184
one RGB led strip is enough , the light is reflected by the ALU foil and the transparent cover  (transparent multi-layer roof panel )
be sure to mount the ledstrip on an aluminium bar (cooling of the led strip)








SBB

08/2018

SBB

08/2018

/SBB

SBB signal from ArtandTrains.it

Youtube link

24/08/2018

video
07/2018
x

We tried the catenary concept with the DB catenary (poles from  Demko and Wunder , see youtube video)

07/2018


NPNP
06/2015

NP
01/08/2015

NP


church
15/08/2017

swiss

08/2017

sbb

07/2018

sbb

07/2018

sbb

08/2018

sbb

07/2018


A lot of work is still needed ...







 




















Laatste updates Contact Disclaimer